Inspections called in on Saturday or Sunday will not be scheduled until Tuesday. Any decors are also waterproofed, and your Contractor makes definite that every wood member is carefully protected. "Framing inspections shall be made after the roof deck or sheathing, all framing, fire blocking and Performed prior to the installation of stucco or synthetic stucco material. Drywall, Exterior & Interior Lath Inspections. Lath bundles labeled 2.5 but not 2.5 "Utility" or 2.5 "Nominal" Self-furring or furred inch minimum Oriented parallel to supports (horizontal) Fastening. Lath bundles labeled 2.5 but not 2.5 "Utility" or 2.5 "Nominal" Self-furring or furred inch minimum Oriented parallel to supports (horizontal) Fastening. Requesting an Inspection. The cost of a building inspection is included in the permit fee. This inspection occurs after the rough electrical, rough mechanical, rough plumbing inspections, roof deck, shear wall, and exterior lath inspections have been completed and approved and after all framing is complete. Exterior Lath - IVR Code 53. The code references the ASTM C926 for the application of stucco and the ASTM C1063 for the application of the metal lath (we will cover that later - assume for now it does). Exception: Gypsum board that is not part of a fire-resistance -rated assembly or a shear assembly. FBC 2514.3.4, FBCR R703.7.1, ASTM C1063 heck for lap of mesh (1/2" at sides/1" at ends). 2503.1 Inspection. includes. SECTION 2506 - EXTERIOR LATH. Lath is simply the first step in the stucco process. The minimum inspections consist of Foundation, Framing, Rough Electrical, Plumbing, HVAC, Insulation, Drywall, Exterior Lath, Roof Sheathing and Final. Lath (cont.) A structural Inspection shall approve the lath before the interior of the exterior wall will be approved to cover with insulation and drywall in both the commercial and residential setting. Inspection requests must be made prior to 4:00pm on a City business day in order for the inspection to be scheduled for the following business day. ASTM E 330: Standard Test Method for Structural Performance of Exterior Windows -FoS = Factor Exterior lath nailing inspection must be approved. Do not cover any building, electrical, plumbing, mechanical, or fuel gas components that require inspection. all of the rough-in inspections required by your permit that have not already been approved. Drywall nailing is inspected before taping. 2. mfr specs, LATH INSTALLATION Ch 6 R703.7.3, IRC 703, IRC 703.2, IRC 703.7.3 Exterior wall envelope designed and constructed in a manner that prevents theaccumulation of water within the wall assembly by providing a water-resistant barrier behind the exterior veneer and a means of draining water that enters the assembly to the exterior For a new house or a large addition, prior to a frame inspection the engineer of record must See Section 2501.4. When using AIRS to schedule an inspection request, it is recommended that you write down your inspection request confirmation number for future reference. LATH & PLASTER INSPECTION CHECKLIST (Residential) PLANS EXAMINATION. 2506.1 General. Florida Building Code at will, inspection of the metal lath may have been included in the local code officials checklist. "Framing inspections shall be made after the roof deck or sheathing, all framing, fire blocking and Exterior surfaces are weather-exposed surfaces as defined in Section 224 . Wood supports for lath, gypsum board or gypsum panel products, as well as wood stripping or furring, shall be not less than 2 inches (51 mm) nominal thickness in the least dimension. A structural Inspection shall approve the lath before the interior of the exterior wall will be approved to cover with insulation and drywall in both the commercial and residential setting. For purposes of this information, a residential construction project is defined as the construction of a one or two-family dwelling. SEWER AND WATER SERVICE CONNECTION BUILDING INSPECTION must be made after the approved piping is in place and the appropriate test is applied. Building paper, lath and all flashing (including weep . The IBC 110.3.4 states: a. This checklist is a guide and not a comprehensive list. This inspection must be completed . Interpretation: 1. Complete Rough - (100): This inspection . all of the rough-in inspections required by your permit that have not already been approved. . 1405.5 Wood Veneers. A shower pan water test inspection is required. (First Floor), Palo Alto, CA 94301 - (650) 329-2496 . Complete Rough - (100): This inspection . For eave overhangs required to be fire resistive, see Section 705. FBC 2510, ASTM C1063 Exterior Lath Page 1 of 3 Revision Date: 2/14/2018 City of Palo Alto Development Services Building Division - 285 Hamilton Av. . If the fastening pattern is not specified on the approved plans, I would ask the build- . This inspection occurs after interior and exterior plywood shear walls have been installed and nailed off, but before any finish wall materials (plaster lath, siding, etc.) An exterior lath is installed by a weather-resistant black paper sheet to save the wood framing from wetness. All lath and lath attachments shall be of corrosion-resistant material. To protect the wood framing from moisture . Lath, gypsum board and gypsum panel products shall be inspected in accordance with Section 110.3.5. Next inspection 155 FF Elevation if REQUIRED on permit, inspected before concealing with any exterior wall covering. 2506.2 Corrosion Resistance. It provides information to architects, the construction community and the public on a variety of matters relating to the plaster trades. Tile lath (vertical surfaces) and exterior cement plaster lath is inspected after the flashings and weep screeds are in place. Exterior Lath - IVR Code 53. . The top row may follow the eave line. The Department doing the inspection must be contacted the morning of the inspection prior to 8am to confirm the inspection time and request an inspection time-frame from the inspector before they leave for the field, as office staff are unable to provide time-frame estimates. Final Inspection. With the roof in place, the siding of the home can be installed to finalize the home's enclosure. The exterior lath installation might be instantly followed within 7 days with cement or other authorized building finish . This checklist is a guide and not a comprehensive list. Intermediary inspections traditionally include underground plumbing and electrical, exterior sheer and roof nail inspection that allow weather covering prior to frame combo, insulation, and electric meter release prior to . INSPECTIONS: Inspectors are faced with many difficult challenges, none more than in-progress metal lath and stucco application inspec-tions for code compliance. Interpretation: 1. Building paper, lath and all flashing (including weep . The main purpose of these materials is to protect the house from external elements, so many precautions are taken to ensure they do. ASTM C847 Metal lath shall be lapped not less than 1 inch at sides and 1 inch at ends per ASTM C847. Drywall (interior and exterior (if applicable) Inspection of all drywall (gypsum) Inspection of shower backing Final inspection Inspection after all the permitted work has been completed Final affidavits from special inspection agencies, engineers, and Title 24 energy code forms must be available at this time. Performed prior to the installation of stucco or synthetic stucco material. Lath/Drywall: Exterior lath is inspected after interior nailing of wall cover is completed and paper and wire have been nailed and trim is in place. Since 1953, the Minnesota Lath and Plaster Bureau has been recognized as an education and technical spokesman for the lath and plaster industry. In respect to this, what is a lath inspection? Inspections called in on Saturday or Sunday will not be scheduled until Tuesday. For a stucco lath inspection, use the "325 - Interior/Exterior Lathing" AIRS inspection code. Inspection dates are the next business day if scheduled prior to 3:30 p.m. the business day before. For more information, please contact the Construction Services Division at 813-274-3100. Final: This last inspection will occur when all fixtures are in place and the building is ready for occupancy; HOW MUCH DOES IT COST? When the stucco or re-stucco is complete, use the "335 - Final" AIRS inspection code. (First Floor), Palo Alto, CA 94301 - (650) 329-2496 . Siding or Exterior Lath - Price Builders. INSPECTIONS: Inspectors are faced with many difficult challenges, none more than in-progress metal lath and stucco application inspec-tions for code compliance. FBC 2510, ASTM C1063 If this inspection is approved, the exterior footings may be poured. It consists of water resistant paper, (sometimes eps foam) wire and other metal components that make up the essential "framework" for the cement to be adhered to. Rough Inspections (Plumbing, Mechanical, and Electrical) These inspections can be performed individually or combined (combining the rough inspections Any decors are also waterproofed, and your Contractor makes definite that every wood member is carefully protected. Exterior lath nailing inspection must be approved. Exterior Lath Page 1 of 3 Revision Date: 2/14/2018 City of Palo Alto Development Services Building Division - 285 Hamilton Av. The exterior wall envelope shall include flashing as described in Section 703.4 Metal lath or wire fabric lath shall be applied with the long dimension of the sheets perpendicular to supports. For a stucco lath inspection, use the "325 - Interior/Exterior Lathing" AIRS inspection code. LATH 510 & 520 TOP OUT ROUGHS 310,320, 330340 370 STRAP / SHEAR PRE-SLAB 130 UNDERFLOOR PLUMBING 205 STEM 110 FF 155 FOOTING 105 TRADITIONAL . . Interior lath or drywall shall be completely secured (nailed or screwed) prior to the exterior lath inspection . Residential Site Inspections. LATH INSPECTION CHECKLIST The lath inspection will not be performed until the framing and tie down inspections have been approved. The purpose of this app is to provide a better understanding of the Exterior Lath & Stucco Inspection process and the relationship between the building inspector and the contractor. Siding or Exterior Lath. This inspection must be completed . Following approval of this inspection, when exterior lath/type D _ paper is installed and approved by a Building Inspector, it should be covered immediately (typically within 7 days and no longer than the time allowed by the manufacturer) by stucco or other approved building finish wall materials. Inspections are required at various stages of construction. Always check with your Construction Inspector for specific details. 2503.2 Additional requirements for inspection and testing. Lath or Gypsum Board: These inspections are performed after all interior or exterior lath or interior wallboards are installed; but before any plaster, siding, stucco, tile, veneers, or other surface coverings are applied or any wallboard joints and fasteners are taped and finished. 2504.1.1 Wood Framing. Exterior Lath: This inspection is completed prior to the application of the exterior finish after the installation of the vapor barrier and or lath. This inspection must be completed prior to the scratch coat application and before any drywall finishing is applied. . EXTERIOR LATH INSPECTION CODE: 218 SCOPE: RESIDENTIAL CODES ENFORCED: 2016 CBC, CRC, CPC, CMC, CEC, CALGreen, CEnC, and PAMC The information provided in this . 8/3/2021 10:39:12 AM Need approved site plans on site for inspection 08/03/2021: PRE WRAP: Phil Brandenburg: CORRECTIONS: 484609: 8/3/2021 10:39:15 AM Need approved site plans on site for inspection 08/03/2021: . . The exterior lath installation might be instantly followed within 7 days with cement or other authorized building finish . includes. The top row may follow the eave line. have been installed. The information in this app is designed to better prepare projects meet correct building code, such as: use of exterior wall cladding Exterior Lath: This inspection is completed prior to the application of the exterior finish after the installation of the vapor barrier and or lath. The exterior wall envelope shall include flashing as described in Section 703.4 Metal lath or wire fabric lath shall be applied with the long dimension of the sheets perpendicular to supports. Interior lath or drywall shall be completely secured (nailed or screwed) prior to the exterior lath inspection . Clearances required by other City agency's must be completed (permit card signed). Lath and gypsum board inspections shall be made after lathing and gypsum board, interior and exterior, is in place, but before any plastering is applied or gypsum board joints and fasteners are taped and finished. The code references the ASTM C926 for the application of stucco and the ASTM C1063 for the application of the metal lath (we will cover that later - assume for now it does). The exterior lath shall cover and terminate on the attachment flange of the weep screed. LATH INSPECTION CHECKLIST The lath inspection will not be performed until the framing and tie down inspections have been approved. Inspection dates are the next business day if scheduled prior to 3:30 p.m. the business day before. Fastening Staples - 1+ inch leg - + inch crown Vertically not to exceed 7 inches on center . Lath is simply the first step in the stucco process. The IBC 110.3.4 states: a. EXTERIOR LATH INSPECTION CODE: 218 SCOPE: RESIDENTIAL CODES ENFORCED: 2016 CBC, CRC, CPC, CMC, CEC, CALGreen, CEnC, and PAMC The information provided in this . What Is Stucco Lath, Anyways? Check for attachment details. ASTM C847 Metal lath shall be lapped not less than 1 inch at sides and 1 inch at ends per ASTM C847. An exterior lath is installed by a weather-resistant black paper sheet to save the wood framing from wetness. Lath & Nail - (108): Stucco lath and accessories are inspected before the application of stucco. When the stucco or re-stucco is complete, use the "335 - Final" AIRS inspection code. The general contractor/owner-builder or their duly authorized representative is responsible for verifying . LATH & PLASTER INSPECTION CHECKLIST (Residential) PLANS EXAMINATION. 10. Lath & Nail - (108): Stucco lath and accessories are inspected before the application of stucco. When using AIRS to schedule an inspection request, it is recommended that you write down your inspection request confirmation number for future reference. FBC 2514.3.4, FBCR R703.7.1, ASTM C1063 heck for lap of mesh (1/2" at sides/1" at ends). Fastening Staples - 1+ inch leg - + inch crown Vertically not to exceed 7 inches on center . For a new house or a large addition, prior to a frame inspection the engineer of record must EXTERIOR LATH: Phil Brandenburg: CORRECTIONS: 453404: 8/3/2021 10:39:28 AM Need approved site plans on site for inspection Lath & Nail - (108): Stucco lath and accessories are inspected before the application of stucco. SEWER AND WATER SERVICE CONNECTION BUILDING INSPECTION must be made after the approved piping is in place and the appropriate test is applied. Drywall (interior and exterior (if applicable) Inspection of all drywall (gypsum) Inspection of shower backing Final inspection Inspection after all the permitted work has been completed Final affidavits from special inspection agencies, engineers, and Title 24 energy code forms must be available at this time. 2506.3 Backing. It attaches to the substrate and is the structure for the following coats. Exception: The minimum nominal dimension of wood furring strips installed over solid backing shall be not less than 1 inch by 2 inches (25 . Do not cover any building, electrical, plumbing, mechanical, or fuel gas components that require inspection. This inspection occurs after the rough electrical, rough mechanical, rough plumbing inspections, roof deck, shear wall, and exterior lath inspections have been completed and approved and after all framing is complete. This inspection must be completed prior to the scratch coat application and before any drywall finishing is applied. Wood veneers on exterior walls of buildings of Type I, II, III and IV construction shall be not less than 1 inch (25 mm) nominal thickness, .438-inch (11.1 mm) exterior hardboard siding or .375-inch (9.5 mm) exterior-type wood structural panels or particleboard and shall conform to the following: EXTERIOR LATH: David MacLean: TBD: APPROVED: 06/01/2022 : B21 . Check for attachment details. Lath (cont.) Inspections requests can be made by the following ways: Online Inspection Request (Online Form can be found at the bottom of this page) By voice message via the Automated Inspection line 949-493-3172. Regularly called inspections include foundation, rough frame combination, exterior lath and drywall, and final inspection. Prefabricated exterior walls are changing the game in .